Minelab F3 Manual de Serviço Página 16

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 42
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 15
F3 Field Service Manual
Page 16
Figure 12: Correct Fitting of the Wiring Loom into the Electronics Pack
NOTE
Take great care when connecting the wiring loom plug to the electronics pack. DO NOT
force the connection because this could damage or break the connector on the printed
circuit board.
Fold excess wiring loom cable into the electronics pack above the plug.
Figure 13: Excess Wiring Loom Cable Folded Correctly & Cable Router
Refit the bulkhead cover with six screws.
Route the wiring loom around the cable router on the side of the bulkhead cover.
(Figure 13)
Refit the sensitivity endcap.
Vista de página 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 41 42

Comentários a estes Manuais

Sem comentários