Minelab F3 Manual de Serviço Página 29

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 42
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 28
F3 Field Service Manual
Page 29
Figure 38: Correct Fitting of the Wiring Loom into the Electronics Pack
NOTE
Take great care when connecting the wiring loom plug to the electronics pack. DO NOT
force the connection because this could damage or break the connector on the printed
circuit board.
Fold excess main wiring loom cable into the electronics pack above the plug. (Figure
39)
Figure 39: Excess Wiring Loom Cable Folded Correctly
Refit the bulkhead cover with six screws.
If necessary, apply a light covering of silicone grease to the split grommet and fit it
into the opening on the bulk head cover (Figure 40) and secure it into place with the
ribbon cover and two screws.
Figure 40: Split Grommet & Bulk Head Cover Opening
Vista de página 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 41 42

Comentários a estes Manuais

Sem comentários