Minelab F3 Manual de Serviço Página 19

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 42
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 18
F3 Field Service Manual
Page 19
NOTE
Once a coil pin is fitted to a coil cable, it is not necessary to fit a coil plug retainer.
Connect the coil cable pull through to the coil plug. (Figure 18)
Figure 18: Coil Pull Through Connected to Coil
NOTE
If a coil pull through is not available a length of string can be used.
Prior to threading the cable through the shafts, ensure the cable has 52 turns in the
coil cable curly section. (Figure 19)
Figure 19: Coil Cable with 52 Turns
Slide the coil cable pull through the shafts starting from the lower end until the lower
camlock assembly is resting above the coil. (Figure 20)
Figure 20: Using the Pull Through to Thread Cable Through Shafts
Vista de página 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 41 42

Comentários a estes Manuais

Sem comentários